What regulations apply when relocating servers to another country?

Jasmijn Odink ·

Relocating servers to another country involves navigating a layered set of regulations that span data protection law, customs rules, encryption export controls, and documentation requirements. The specific rules that apply depend on where the servers are moving from, where they are going, and what data they carry. Below, we answer the most common questions businesses face when planning an international server move.

Which countries have the strictest data sovereignty laws for servers?

The countries with the strictest data sovereignty laws for servers include China, Russia, India, and the member states of the European Union. These jurisdictions either require that certain categories of data be stored on servers physically located within their borders or impose significant restrictions on how data can be transferred abroad.

China’s Cybersecurity Law and Data Security Law require that data classified as “important” or relating to critical information infrastructure be stored domestically. Companies operating in China must also undergo a security assessment before transferring data outside the country. Russia similarly mandates that personal data of Russian citizens be stored on servers located within Russian territory under Federal Law No. 242-FZ. Non-compliance has resulted in platforms being blocked entirely.

India introduced its Digital Personal Data Protection Act in 2023, and while its cross-border transfer provisions are still being finalized through secondary legislation, the direction is toward tighter controls on where data can flow. In 2026, businesses relocating servers to or from India should verify the current status of these rules before proceeding.

Within the European Union, data sovereignty is enforced primarily through the GDPR, which does not require data to stay inside the EU but sets strict conditions for transfers outside it. Several EU member states, particularly Germany and France, also apply additional national-level requirements for public-sector and critical infrastructure data. Understanding which jurisdiction governs your data is the essential first step before any server relocation.

Does GDPR apply when moving servers outside the EU?

Yes, GDPR applies when moving servers outside the EU if those servers process or store personal data belonging to EU residents. The regulation does not stop applying simply because the hardware crosses a border. Instead, GDPR governs where that data can legally go and under what conditions it can be accessed or processed once it arrives.

Under GDPR, transferring personal data to a country outside the European Economic Area is only permitted if one of the following conditions is met:

  • The destination country has received an adequacy decision from the European Commission, meaning it is recognized as providing equivalent data protection (examples include Japan, Canada, and the United Kingdom post-Brexit under the current framework).
  • The transfer is governed by Standard Contractual Clauses (SCCs), which are pre-approved contract templates that bind the receiving party to GDPR-equivalent protections.
  • The organization has implemented Binding Corporate Rules (BCRs), which are internal data protection policies approved by a supervisory authority for intra-group transfers.
  • A specific derogation applies, such as explicit consent from the data subject or necessity for the performance of a contract.

Physically shipping a server to a non-adequate country without one of these mechanisms in place constitutes an unlawful transfer under GDPR, regardless of whether any data is actively transmitted over a network. Before relocating servers outside the EU, organizations should conduct a Transfer Impact Assessment to evaluate whether the legal protections in the destination country are sufficient and document this assessment as part of their accountability obligations.

What customs and import regulations apply to physical server hardware?

Physical server hardware is subject to standard customs and import regulations when crossing international borders, including import duties, value-added tax or goods and services tax, and product compliance requirements. The specific obligations depend on the destination country’s tariff schedule, the declared value of the equipment, and whether preferential trade agreements apply.

In most jurisdictions, servers are classified under specific Harmonized System (HS) codes, typically within Chapter 84 covering automatic data processing machines. The applicable import duty rate varies by country. Some countries offer duty-free treatment for ICT equipment under the World Trade Organization’s Information Technology Agreement, to which over 80 countries are signatories. Businesses should verify whether the destination country is a signatory and whether their equipment qualifies.

Temporary import and ATA Carnets

If servers are being relocated temporarily rather than permanently, a Temporary Admission procedure or an ATA Carnet may allow the equipment to enter a country duty-free for a defined period. ATA Carnets are internationally recognized customs documents accepted in over 80 countries and are commonly used for professional equipment, including servers used at project sites or temporary data centers.

Product compliance and certification

Beyond duties, server hardware must meet the technical and safety standards of the destination country. In the EU, this includes CE marking and compliance with the Radio Equipment Directive and the Low Voltage Directive. In the United States, FCC certification applies. In some markets, equipment must undergo local certification testing before it can be legally operated. Failure to meet these requirements can result in the equipment being held at customs or returned.

For businesses managing complex cross-border hardware moves, working with a logistics partner experienced in project logistics and customs clearance can significantly reduce the risk of delays or compliance failures at the border.

How do encryption export controls affect server relocation?

Encryption export controls can directly affect the legal movement of servers to another country because servers containing cryptographic hardware or software may be classified as dual-use goods. Dual-use goods are products with both civilian and potential military applications, and their export is regulated by national authorities and international agreements.

The primary international framework governing encryption exports is the Wassenaar Arrangement, a multilateral export control regime with over 40 participating states. Under this arrangement, encryption products above certain key-length thresholds are subject to export licensing requirements. In practice, most modern commercial encryption used in standard server hardware falls within exemptions for mass-market products, but organizations should not assume this without verification.

In the United States, the Export Administration Regulations (EAR) administered by the Bureau of Industry and Security govern encryption exports. Many commercial encryption products qualify for License Exception ENC, which allows export to most destinations without a specific license, but exports to embargoed countries or to parties on restricted lists remain prohibited regardless of the encryption classification.

Within the EU, Regulation (EU) 2021/821 governs dual-use export controls. Member states issue licenses, and the rules apply not only to physical export but also to the transmission of encryption technology to persons outside the EU. Before relocating servers to a country subject to trade restrictions or sanctions, organizations must screen both the destination and the end user against applicable control lists.

What happens to data stored on servers during an international move?

During an international server move, data stored on the servers remains on the physical hardware throughout transit unless it is deliberately wiped or migrated beforehand. This means the data is effectively transported across borders along with the equipment, which can trigger legal obligations under both the originating and destination countries’ data protection and export laws.

Organizations have several options for managing data during a server relocation:

  • Data migration before physical move: Transfer all data to a cloud environment or alternative servers in the destination country before shipping the hardware. The physical servers are then transported empty or with a clean operating system only.
  • Full disk encryption: Encrypt all data on the server before transit so that even if the hardware is lost, seized, or inspected during customs, the data cannot be accessed without the decryption key. This is widely considered best practice for any server shipment.
  • Secure data destruction: If data does not need to be relocated, use certified data destruction methods compliant with standards such as NIST 800-88 before shipping the hardware. Obtain a certificate of destruction for audit purposes.
  • Chain of custody documentation: Maintain a documented chain of custody throughout transit, recording who has physical access to the servers at each stage of the journey.

The risk of data exposure during transit is not purely theoretical. Customs authorities in some countries have legal powers to inspect equipment crossing their borders, which could include accessing data on unencrypted drives. Encrypting data before transit is the most effective mitigation against this risk.

What documentation is needed to legally relocate servers across borders?

Legally relocating servers across borders requires a set of documents that covers customs compliance, data protection obligations, and export control requirements. The exact list varies by origin and destination country, but the following documents are required in most international server moves.

  • Commercial invoice: A detailed invoice listing the equipment, its value, country of origin, and the parties involved in the transaction. This is the foundation document for customs clearance.
  • Packing list: An itemized list of all equipment being shipped, including serial numbers, weights, and dimensions. For servers, serial numbers are particularly important for tracking individual units.
  • HS code classification: Confirmation of the correct Harmonized System tariff code for the equipment, which determines the applicable duty rate.
  • Certificate of origin: A document confirming where the goods were manufactured, which may be required to claim preferential tariff rates under trade agreements.
  • Export license or exemption documentation: If the servers contain controlled encryption or other dual-use technology, documentation confirming the applicable export license or the basis for an exemption.
  • ATA Carnet (if applicable): For temporary imports, this document replaces standard customs declarations and guarantees payment of duties if the goods are not re-exported within the agreed period.
  • Data transfer impact assessment: Under GDPR and equivalent frameworks, a documented assessment of the legal basis for transferring personal data to the destination country, including any Standard Contractual Clauses or adequacy decisions relied upon.
  • Chain of custody records: Internal documentation tracking physical access to the servers throughout the move, supporting both data protection accountability and insurance claims if equipment is damaged.

Preparing this documentation before the move begins, rather than during or after, is the most effective way to avoid customs holds and regulatory complications. Organizations handling frequent cross-border hardware movements benefit from establishing a standardized documentation checklist and working with logistics partners who understand both the physical and regulatory dimensions of server relocation. Our warehousing and logistics solutions include customs clearance support, which can form part of a broader server relocation plan where physical handling and compliance documentation need to be coordinated together.